Project Description

Salford Cathedral Data Installation

The Diocese of Salford embarked on a new Era when they designed the administration block within the boundaries of Salford Cathedral at the heart of the City. The structured cabling was designed for the future and a Krone Cat6 Truenet system was decided upon in order to future proof the business needs of the Salford Catholic Diocese. The Electrical Contractor appointed GB Integrated Systems Ltd to pull together the design with the consultants and install, test and commission over 700 Cat6 data outlets across the whole site. The project threw up many challenges but not least the electrical contractor going bust part way through leaving GBIS in a predicament, but with determination and absolute professionalism team GBIS completed the job to the client’s satisfaction.

For further information about this project feel free to call 01282 451300

Download Case Study PDF